Call 0413 650 514

Recorded strip-out stages

Balcony rot repair: from ceiling cracks to opened framing.

Water marks at the entry and cracks in the porch ceiling led to opening up a tiled balcony over a doorway. The recorded photos show the failed surface, the decayed timber beneath and the protection set up before the rebuild. The new substrate, waterproofing and finish are agreed after the strip-out, not assumed from the surface.

Stage 01

Signs at the entry

Staining on the brickwork and weeds at the balcony edge, with cracking in the porch ceiling below, showed moisture moving through the balcony build-up.

Brick house entry with a tiled balcony above the doorway, staining on the brickwork and weeds at the balcony edge
The entry below the balcony: staining and plant growth at the edge.
Porch ceiling below the balcony with cracks radiating around the light fitting
Cracked ceiling lining below the balcony, around the light fitting.

Stage 02

Opening the surface

Lifting the tiles and bedding exposed saturated, decayed timber. The affected battens and bearer sections were removed back to sound material before any rebuild was priced.

Gloved hand lifting a broken tile from the balcony, exposing dark decayed timber beneath the bedding
Tiles and bedding lifted to expose the decayed timber.
Close view of a decayed timber bearer with splintered, saturated fibres beside the balcony edge
The bearer section soft and splintered from prolonged moisture.
Balcony edge opened up with the perimeter bearer exposed and decayed timber debris around it
The perimeter edge opened for assessment.

Stage 03

Strip-out and protection

With the failed build-up removed, the joists and bearers are visible for assessment. Plastic sheeting protects the doorway and opening below while the replacement substrate, waterproofing and finish are agreed.

Balcony stripped to the joists with removed painted battens laid across the opening and debris below
Stripped back to the framing; removed battens laid across the opening.
Plastic sheeting taped over the balcony opening and doorway to protect the area below during the rebuild
Sheeting taped across the opening to protect the entry below.
Balcony perimeter and balustrade with plastic sheeting secured along the edges above the stripped framing
Perimeter sheeting secured before the rebuild stages.

After the strip-out

The rebuild is agreed once the framing is sound.

These photos record the investigation and strip-out. The replacement substrate, waterproofing and finish are confirmed for the site after the opening-up, with each stage set out in the quote.

  • Replace decayed framing and confirm a suitable substrate before waterproofing.
  • Renew falls, outlets and threshold details as part of the agreed waterproofing scope.
  • Retile or finish the surface once the membrane stage is complete and checked.